Our wide scope of project completions cover the entire spectrum of industries. BP Mechanical delivers a rock-solid record of 100% satisfaction which is ever-present in our prestigious project showcase. Here’s a sampling for your review.

CAPITAL ONE 43RD FLOOR UNIT REPLACEMENT

A plan & specifications project redesigned by BP requires the substitution of an original split AC Unit with the Liebert packaged AC unit, as part of the Value Engineering process. Projects similar to these provide a better and less expensive alternative without compromising the overall needs of our client’s.

VERIZON 204 SECOND AVENUE

Multiple installation projects for Verizon at 204 Second Avenue include:
-installation of new chilled water AC Unit on the 4th floor
-installation of a new dry cooler on the 9th floor
-installation of a critical Computer Room AC Unit on 9th floor

As of June 22nd, 2017 BP Mechanical has been a certified Verizon vendor. As a result, we can perform General Contracting and Mechanical work directly for Verizon teams, without the intermediate of a contractor.

 

VORNADO COIL REPLACEMENT AT 1 PENN PLAZA

Turn-key project performed directly for Vornado Realty Trust included removal & replacement of ten existing Air Handling Unit Chilled Water Coils on the 32nd floor.

CONVENE 32 OLD SLIP

Our Special Project Group Engineers are responsible for the project design. The job included the replacement of a 60-ton AC Unit with a New Modular 60-ton AC Unit. The unit is located on the second-floor Mezzanine.
We anticipate creating the most advanced building environment for Convene, as we are proud to be a prime contractor.

VORNADO 1290 AVENUE OF THE AMERICAS

Project performed directly for Vornado Realty Trust including the removal & replacement of an existing 18” chilled water valve.